Construction

Construction Licence

A building permit or permit is an official document given by the municipality to the owner or contractor, during which it is allowed to start and continue the construction or renovation project according to certain criteria. It is obvious that carrying out any construction operation without issuing a building permit is illegal and will be stopped by the building supervision authorities. These rules and standards are intended to ensure the safety of the current or future owners of the building. The most important goal of obtaining a construction permit is to ensure legal construction in accordance with technical indicators and following the principles of urban planning in accordance with the regulations and rules of the master plan. Among the other benefits of obtaining a license, we can mention the benefit of banking facilities, the insurance of the building and the people working in the building, the prevention of construction accidents, and the use of technical and engineering experiences in the construction of the building.

Steps

Filing

Identification documents
Toll settlement

Issuing a visitation order

Issuing a visitation order

Check the technical report

Compliance with the detailed plan
Identification of the user

Map command

The remaining dimensions of the property apart from the reforms
Land area after reforms
Number of floors
Occupancy level

Map design

Map design
Reforms
Map redesign

Payment of tolls

Complications of renovation
Tax

Preparation of draft documents

Quota sheets
Contract
Corrective compliance commitment sheet
Obligation to obtain approval

issuing permit

issuing permit

Required documents to obtain a construction permit:

1) Supervision commitment sheet
2) Accountant’s commitment sheet + structural drawings (execution)
3) Completed employer (owner) commitment form and signed certificate in one of the notary offices
4) Toll receipts under the building, renovation of the current year
5) Answer letter from insurance, telecommunications, water and electricity department
6) The original and copy of the ownership document in the name of the current owner
7) The permission to prepare a map with the seal and signature of the designer and the approval of the Urban Planning Engineer Affairs Unit
8) Drafting of the permit by the mayor
9) completion of the building’s birth certificate by the municipality
10) Obtaining the signature of the license (draft recipient, accountant, technical and urban planning officer, deputy or mayor).

Our added value

High speed of action

High technical standards

Good price

Creating customer satisfaction

Our capacities

Full familiarity with the licensing process

Effective experiences in obtaining a license

Choosing the best options in obtaining a license

Prospective approach in obtaining permission

Related posts